Preparing your floor for Floors For Paws

To ensure you have a lifetime of hassle free flooring it is essential to have your sub-floor prepared in the correct manner. If you have a perfectly smooth and dry sub-floor you can simply adhere Floors For Paws directly onto it. Unfortunately this is rarely the case, so we would like to look at the best solutions.

Latex sub-floor
This option is a quick and trusted process to ensure your FFP is fitted onto a suitable base. It is used on existing concrete floors that need to be smooth and levelled. Quick drying options such as the Stopgap 300 is ready to walk on in 2 hours and to work on in 4. This solution is also ideal for going over existing tile floors (who wants to take out all the tiles and build up again!) The photo below shows a kitchen diner before and after being latexed. As you can see the grout lines show through while it is drying but as long as 3-4mm is applied onto the tiles the surface will dry completely smooth.

Tiled floor
1. Tiled floor

Two hours post latex
2. Two hours post latex

Greenwood
3. Greenwood

SP101 Ply board – Flooring Grade
Ply board should be used over existing wood flooring, or when you need to bring up the level of the floor by over 4mm. In the case below the carpet that was removed was 10mm and therefore too deep to apply a latex without the need for Grano chippings. This depth of latex would take two months to dry! The 9mm ply board is cut into place and secured with mechanical fixings at regular intervals to ensure no movement. The ply board is then ready for FFP to be adhered directly onto it. We recommend a minimum of a 6mm ply board base.

Build up with 9mm ply
4. Build up with 9mm ply

Wychwood
5. Wychwood

If you are not a DIY nut; don’t worry because our recommended installers can carry out the preparation and installation for you. Call us today to discuss any aspect of your project on 01937 830948.